Difference between revisions of "TMS320DM355 VPU"

From MyLabWiki
Jump to: navigation, search
(Resources)
Line 1: Line 1:
 
== 2009-06-02 ==
 
== 2009-06-02 ==
 
[http://www.leopardboard.org/ Leopard Board] has arrived. Delivery time was 1 week US → DK. See post on the [http://www.googlelunarxprize.org/lunar/teams/frednet/blog/open-source-video-processing Team FREDNET blog].
 
[http://www.leopardboard.org/ Leopard Board] has arrived. Delivery time was 1 week US → DK. See post on the [http://www.googlelunarxprize.org/lunar/teams/frednet/blog/open-source-video-processing Team FREDNET blog].
 +
 +
== 2009-11-03 ==
 +
Accidentally connected a 9V power supply to the Leopard Board. It didn't take long before board started smoking. After that it didn't look like it was running.
 +
  
 
<gallery widths="100px" heights="100px" perrow="6">
 
<gallery widths="100px" heights="100px" perrow="6">

Revision as of 23:59, 7 November 2009

Contents

2009-06-02

Leopard Board has arrived. Delivery time was 1 week US → DK. See post on the Team FREDNET blog.

2009-11-03

Accidentally connected a 9V power supply to the Leopard Board. It didn't take long before board started smoking. After that it didn't look like it was running.


2009-06-03

I realized that I didn't have a 2.5 mm jack connector that is needed to make a serial cable. I ordered one, but now we have to wait.

Resources

References

Embedded Video Processing and Radio Unit